|
Post by ninworks on Apr 4, 2024 4:50:22 GMT -5
|
|
|
Post by Auf Kiltre on Apr 4, 2024 7:47:34 GMT -5
Some sort of motor rebuild, right? For those of us who can't tell the difference between a cam and a canooten valve, whacha workin' on there?
|
|
|
Post by ninworks on Apr 4, 2024 8:28:35 GMT -5
A 250CC 2 stroke Yamaha motocross bike engine rebuild. If I could get all the backordered parts delivered for it I could put in back together. Been waiting for 4 weeks now. They told me that maybe I'd get them this week. I hope so.
|
|
professor
Wholenote
"Now I want you to go in that bag and find my wallet." / KMMFA
Posts: 621
|
Post by professor on Apr 4, 2024 9:31:01 GMT -5
Looks tidy as you're waiting for the parts. When you're in action does it stay as neat?
|
|
|
Post by rickyguitar on Apr 4, 2024 9:36:43 GMT -5
Man needs a hobby.
|
|
|
Post by Leftee on Apr 4, 2024 9:45:22 GMT -5
I build weird guitars.
|
|
|
Post by gato on Apr 4, 2024 11:47:36 GMT -5
A 250CC 2 stroke Yamaha motocross bike engine rebuild. If I could get all the backordered parts delivered for it I could put in back together. Been waiting for 4 weeks now. They told me that maybe I'd get them this week. I hope so. The parts were sent to my house by mistake. I have two packed thistle bearings, one skank sprocket and half of your titanium sway baggers.
|
|
|
Post by Auf Kiltre on Apr 4, 2024 11:58:59 GMT -5
You can get all those parts same day delivery from Amazon for only $14.99. The reviews are excellent!
|
|
|
Post by ninworks on Apr 4, 2024 13:13:22 GMT -5
Looks tidy as you're waiting for the parts. When you're in action does it stay as neat? I try to keep it tidy so nothing gets displaced. That was right after I had washed everything off with mineral spirits and inspected it. I leave it sitting on cardboard to absorb any drippage. Now everything is in big sealed plastic boxes with lids on them to keep the dust and bugs out of it. I wish I could get all the parts I need on Amazon. It would be a lot faster. What usually holds things up is that most of the stuff I work on is 5 to 20 years old, most of it more than 5, so a lot of the suppliers don't have much in stock for the machines I work on. They often have minimum orders they have to place from their suppliers. Sometimes they have to wait until they get enough orders.
|
|
|
Post by LVF on Apr 4, 2024 15:10:10 GMT -5
Hmmm, gas powered reverb, echo or fuzz?
|
|
|
Post by Leftee on Apr 4, 2024 15:12:48 GMT -5
GAS
|
|
|
Post by Taildragger on Apr 4, 2024 16:40:13 GMT -5
Take the delay off your pedal board and the parts should arrive shortly thereafter...
|
|